Power Project

RADHANAGARI HYDRO POWER PROJECT, MAHARASHTRA.

This 10 MW power project is located in Fegivade Village at the foot of existing Radhanagari Dam which has a Gross storage capacity of 236.79 Mcum. The power house is fully automated driven by Francise Turbines. It is one of kinds in modern India as its unique features are :-

Automation: It is controlled by the most efficient and fail-proof “Automatic Scada System”, which can be run on minimum man power of only ten.

Output Efficiency: It has highest output efficiency for the governor is fully automated. It is connected to 132 KV Voltage levels such that the tripping's are minimized.

Anti-pollutant: The power project reduces carbon foot prints as the power produced is fully utilized for our Textiles unit. Hereby, we utilize GREEN POWER to its fullest in the Textile Industry.

Pride: It is the first captive Hydro Power project allotted and commissioned in Maharashtra .

Eco-friendly: The project construction does not involve any forest destruction, land pollution, environmental pollution or any activity which would disrupt the ecological balance of the area.

Nation Building: With this power project we have tried to confront the electricity shortage calamity to an extent and contributed a humble niche in the state and nation building process.

The completion and commissioning of this project adds another “Feather in the hat” of the Mohite Industries Ltd. It is indeed a very prestigious and highly esteemed Power project which we boast about.

 

 

AMBAI HYDRO POWER PROJECT, MAHARASHTRA. (3.5 MW)

The company have acquired 3.5 MW ( 1.75 x 2) Hydro Power Project at Kalammawadi Dam Foot at/post – Kalammawadi, Tal-Radhangari, Dist-Kolhapur which is given on lease of 30 years by Govt. of Maharashtra Irrigation Department on BOOT Basis. The initial excavation for Power house construction is already started. The expected period to get the project completed is around 18 months.